Case 01 · Northern Territory · public-data screen
Remote Mining Asset — Hybrid Energy Pre-DD
A public-information desktop Pre-DD screen of a remote gold-mine PV + BESS + diesel hybrid, covering F1 Approval, F2 Site, F3 Microgrid and F4 Financeability. Published as a method demonstration; the asset is not named and was not involved in the work.
Project snapshot
Remote mine hybrid-energy screen
Key question
Which hybrid configuration is credible enough to advance to owner data, hourly dispatch, EPC pricing and specialist due diligence?
Key findings
- S4, an indicative 60% annual-renewable pathway, was selected for further validation rather than adopted as a final design.
- The PV and BESS areas identified in the siting screen were preliminary desktop search areas, not selected sites or approved equipment footprints. The site-specific map outputs are not published.
- A modelled 1.30x DSCR constraint is a debt-sizing assumption, not lender approval.
- Owner data, hourly dispatch, equipment sizing and specialist review remain required.
Main indexed version
The canonical online version of this case is the Remote Mining Asset — Hybrid Energy Pre-DD HTML report. This dynamic page is retained for compatibility and interactive detail.