Case studies

Project screens

A project screen takes a single site and asks whether it should proceed, based on approvals, site constraints, the connection arrangement and the financing case. We build it from public records and publish each figure with its source and confidence rating.

How to read these

These are desktop reviews using our four-part early-stage screening method and public information. They are not commissioned advice, lender due diligence or bank-approved models. Figures and zones are indicative early-stage outputs. Nothing here is legal, financial, tax, engineering or investment advice.

The library

Project screens

One project or site at a time: whether it should proceed, which site conditions constrain it, and which evidence is still missing. Screens of third-party assets are published anonymised.

Financeability Screen Illustrative example, not a real site
IndustrialBESS feasibilityEaaS

Weak-grid industrial solar + BESS EaaS

An illustrative screen showing why a large customer saving can still fail the lender test under the current debt structure.

What you receive

What a project screen delivers

A screen can produce three documents for different decisions and audiences.

Output 01

Integrated Pre-DD Report

For public websites, first conversations and non-confidential sharing.

  • Project context
  • F1-F4 readiness snapshot
  • Preliminary siting opportunity and constraint screen
  • Key constraints
  • Limitations
  • Recommended next step
Output 02

Owner Pre-DD Report

For an initial discussion with the owner or sponsor.

  • F1 ten-question approvals screen
  • F2 candidate site and constraint map
  • F3 microgrid boundary questions
  • F4 commercial and financeability logic
  • Integrated gap register
  • Owner data request
  • First meeting agenda
Output 03

Open questions and evidence register

Lists the unresolved questions, who should answer them and the evidence required.

  • Questions that remain open
  • Why each question matters
  • Who should answer it
  • Evidence required, and when
  • Conditions precedent
  • Project milestone: financial close, notice to proceed or commercial operation