Remote Mining Asset — Hybrid Energy Pre-DD
A public-information Pre-DD screen covering F1 Approval, F2 Site, F3 Microgrid and F4 Financeability.
Case studies
Project screens take a single site and ask whether it can advance — approval delta, site suitability, microgrid boundary, financeability readiness. Sector studies take a whole market and ask how big it actually is and who controls it, by reconciling site-level evidence against national accounts. Same engine, two scales.
These are public-information desktop screens of the F1-F4 Pre-DD method, not commissioned advice, lender due diligence or bank-approved models. Figures and zones are indicative early-stage outputs. Nothing here is legal, financial, tax, engineering or investment advice.
The library
Grouped by scale: project screens first, then sector studies. Shorter commentary and perspective pieces sit in Research.
Project screens
One project or site at a time: whether it can advance, what the host constrains, and which evidence is still missing. Screens of third-party assets are published anonymised — the method is the point, not the asset.
A public-information Pre-DD screen covering F1 Approval, F2 Site, F3 Microgrid and F4 Financeability.
An illustrative screen showing why strong customer value can still fail the lender test under the current debt structure.
Sector studies
Built bottom-up from site-level evidence, then tested against national accounts assembled a different way. The output is a ceiling and a named residual.
National reconciliation of the diesel displacement market. Four steps reduce a 1,270 PJ fuel pool to a 45 MW addressable remainder — and identify 390 MW of mine generation booked to the wrong industry.