Submission · Senate inquiry · August 2026
Australia regulates data centres through multiple systems, but cannot trace one facility across them
Australia regulates data centres through energy reporting, grid connection, planning, environmental, water and rating systems. Each system records a different part of the facility and uses different names and boundaries. A public crosswalk is needed to show which records belong to the same site and which rules apply.
What the current records cannot show
The submission asks whether Australia’s existing regulatory systems can identify data-centre facilities consistently, show which rules apply to them, and produce comparable information about their energy and water use. It addresses term of reference (a) and the energy and water elements of term of reference (b); other community, industry and biodiversity impacts are outside its scope.
Key findings
- No public crosswalk was found connecting the records for the same data-centre facility.
NGER reporting, grid connection, planning, environmental approval, water and rating systems use different names, identifiers and facility boundaries. In the public sources reviewed, the public cannot reliably determine which records describe the same physical site.
- Most data-centre records in the NABERS extract used a scope that excludes IT load.
Ten of the 11 data-centre records returned by the 15 August extract used the Infrastructure rating scope. Because that scope excludes IT equipment, the rating cannot by itself show the total energy performance of the data centre. When we checked again on 14 September, six of the 11 ratings remained current, five of them on the same scope. Five of the 11 entries were no longer current one month later, although no facility had closed. This shows why the register needs a stable reporting boundary and a record of expired ratings.
- The proposed 30 MW threshold sits in the National Electricity Rules, which do not operate in Western Australia or the Northern Territory.
The AEMC’s Package 2 draft places the threshold in rules that apply only in NEM jurisdictions. The advice we reviewed did not explain how the threshold would apply to facilities outside the NEM, including off-grid and islanded sites.
- Published water figures do not use a consistent measurement boundary.
One company’s FY2025 reporting labels the same 773 ML figure as both “consumption” and “withdrawal”. Without a common definition, figures from different facilities or reporting systems cannot be compared reliably.
- One EPBC referral classified a data-centre proposal with about 1,038 MW of gas generation as renewable energy.
Searches based only on industry category can therefore miss relevant proposals.
Updated 14 September 2026 from the referral document; the lodged submission used an earlier industry-media range of 900–1,100 MW. The proposal was determined a controlled action on 4 September 2026.
Recommendations
- Use one facility ID
Assign each facility a persistent identifier, then publish a crosswalk connecting its non-sensitive energy reporting, connection, planning, environmental, water and rating records.
- Publish the rules that apply to each facility
Publish which energy, environmental and water frameworks apply to each facility, including NEM, non-NEM and off-grid sites.
- Use common energy and water definitions
Before facilities are compared, define what each figure covers: whether an energy figure includes IT equipment, and whether a water figure means withdrawal or consumption.
Open questions
The submission lists seven matters we could not verify. They include how NABERS star ratings correspond to PUE values, whether NABERS has published a timetable for a data-centre water framework, the final connection arrangement for one of the two Northern Territory proposals, and the water and planning instruments of all eight jurisdictions. Schedule 1 of the Safeguard Rule contains no production variable for a data centre, so the consequence for an off-grid facility is recorded as an uncertainty. We did not obtain legal advice.
Sources
Evidence used
NGER Act 2007, NGER Regulations 2008 and the NGER (Safeguard Mechanism) Rule 2015 as currently compiled (legislation). AEMC advice on data centre regulatory pathways and the Package 2 draft determination (regulator document). EPBC Act Public Portal referral 2026/10560 and supporting documents (regulatory filing). NABERS Rating Register, complete ratings extract of 4,658 rows downloaded on 15 August 2026, filtered to the data-centre building type (public register); validity re-checked against a fresh extract on 14 September 2026. Directive (EU) 2023/1791 Article 12 (legislation). Company annual and sustainability reporting (company disclosure).
The lodged submission is titled Regulatory data gaps that limit policy oversight and independent verification; this webpage uses a shorter summary title. The committee has authorised publication as Submission 89. Authorisation to publish is an administrative decision and does not indicate that any finding has been accepted.
Corrections
Two corrections have been issued since lodgement. Each is recorded with the date of the change, the wording as lodged, the corrected version, and the source relied on. The lodged PDF is not altered, as a lodged document should not be; this page carries the corrections.
14 September 2026 — gas-generation capacity. As lodged, on page 3 twice and in Annex B.4: “900–1,100 MW of gas-fired generation”, in one instance introduced as what the referral states. Corrected to approximately 1,038 MW at full build-out, with 537 MW at Phase 1.
Source relied on: EPBC Act referral 2026/10560, which reads “gas-fired generation providing firm power and independent backup, approximately 1,038 MW at full”. The Phase 1 figure is from the Northern Territory EPA referral report. The range as lodged came from industry media and does not appear in the referral.
1,038 MW falls inside the range as lodged, so no reader would have been misled about the order of magnitude. It is corrected because this submission argues that figures should be traceable to their source, and this one attributed a secondary range to a primary document.
26 September 2026 — attribution of the EPBC classification fields. As lodged, on page 3: the proposal “is recorded on the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) portal under the industry type ‘Energy Generation and Supply (renewable)’, sub-type ‘Solar Farm’”.
Corrected to: the industry type is published on the portal and still reads “Energy Generation and Supply (renewable)”. The sub-type is not a portal field — “Solar Farm” is item 1.1.3 of the referral form, completed by the proponent.
Source relied on: the EPBC Act Public Portal referral summary for 2026/10560, which publishes an industry type and no sub-type, and the lodged referral form.
The finding this sentence supports — that classification fields do not describe a facility’s generation technology — is unaffected. The sentence attributed the sub-type to the wrong source, which is a weaker claim than the one the record supports.
Related research
Safeguard Atlas
The Safeguard Mechanism modelled facility by facility, including the coverage question the submission raises.
Open → ResearchA lower Safeguard threshold would also tighten baselines for existing facilities