We build facility- and project-level accounts from regulatory filings, licences and company disclosures. We cross-check the key figures against independent sources and identify what is reported, calculated, assumed or still unknown.

Selected findings

What the evidence shows

Interactive model · Safeguard Mechanism

The post-2030 decline rate cannot be set in isolation

3.53 pp/yrpost-2030 decline required for a 62% target on the starting-point assumptions, against a statutory 3.285

For any fixed 2035 target, slower reductions for one group require faster reductions elsewhere. Production, new projects and closures also change the rate required. The model uses every facility in the FY2024–25 Safeguard register.

Safeguard Atlas · September 2026
Sector study · Mine energy

The largest future mine-electrification loads may not appear in current electricity data

3.9–4.65 GWtheoretical average electrical load if reported mining diesel (299.6 PJ) were fully converted; about 70–90% of mining’s current electricity consumption

Mining reported 299.6 PJ of diesel, most of it used by mobile equipment that does not appear as electricity demand. Converted to electricity that is a theoretical 3.9–4.65 GW of average load. The addressable market is smaller and depends on fleet timing, mine life, power supply and fuel tax credits.

12-minute read · 6 August 2026
Submission · Senate inquiry

Australia’s data-centre regulatory records are not connected at the facility level

6regulatory systems (energy reporting, grid connection, planning, environmental, water, rating) each hold part of the record; no public facility-level crosswalk was found

Energy, planning, environmental, water and rating systems each hold part of the record, but we found no public crosswalk connecting them to the same physical site. We recommend a common facility identifier, a clear record of which rules apply to each site, and consistent definitions for energy and water data.

Submission 89 · August 2026

Selected project

Battery energy storage at a remote mining site

Screening a 60% renewable pathway for a remote Northern Territory mine

A screen of a hybrid solar, battery and diesel pathway using public information: approvals, site, microgrid boundary and the financing case, run before any development cost is committed. Of the four options screened, the 60% renewable hybrid was the best candidate for detailed hourly modelling and commercial testing.

F1Approvals: what the existing consents cover and what a hybrid would add
F2Site: candidate zones and the constraints that rule them out
F3Microgrid boundary: what the battery must carry when the diesel steps back
F4Financing: whether the contracted cash flow still supports debt after the customer’s savings

Built from regulatory filings, licence records and company disclosures. We label calculated results, assumptions and unanswered questions. Nothing here is a compliance determination, a forecast or financial advice.

Have a facility, project or policy question?

Send a short, non-confidential description of the facility, project, sector or policy question. An initial conversation is usually enough to tell whether public information can help.